30 Year Logo
   
   
 CEALogo 2005 Consulting Engineers of Alberta (CEA) - Award of Merit
 
 

[ Return to Awards Index ]

Bow River Bridge: Deerfoot Extension

The Bow River Bridges form part of the Deerfoot Trail extension to Highway 2 at the south end of Calgary. This project created a much needed crossing of the highway over the Bow River, and represents the largest value engineering project undertaken on behalf of Alberta Transportation. Value engineering was achieved by providing a state-of-the-art, contractor-driven alternate to the base bid that satisfied the client's need for an accelerated schedule and the contractor's desire for simplified construction.

This alternative design utilized prestressed/post-tensioned NU precast girders, which span at 65 metres, and represented the largest plant cast precast elements produced in North America.

[ Return to Awards Index ]

 

Search Site Map Contact Us Legal
Copyright © 2006 A. D. Williams Engineering Inc.